Reference description

  • Full strip-out and refurbishment of second upper storey with store operations continuing on other floors
  • Low area loads required of new coverings due to existing structural fabric
  • Construction with mineral materials needed to meet fire safety requirements
  • Mastic asphalt screeds overcoated with self-levelling anhydrite filler and epoxy screed in first phase
  • Lightweight construction with Sopro LZ 987 SMART® aggregate and Sopro Rapidur® FE 678 screed in second phase