Reference description
- Full strip-out and refurbishment of second upper storey with store operations continuing on other floors
- Low area loads required of new coverings due to existing structural fabric
- Construction with mineral materials needed to meet fire safety requirements
- Mastic asphalt screeds overcoated with self-levelling anhydrite filler and epoxy screed in first phase
- Lightweight construction with Sopro LZ 987 SMART® aggregate and Sopro Rapidur® FE 678 screed in second phase